Museum

Services offered: Bespoke furniture, exhibition installations, stage construction, and shop fittings. Desk & Bench  Collaborating with the Amenity Trust and Ocean Kinetics, we restored a reclaimed boat keel into a functional desk with a glass top. Shop Fixtures and Seating Area We assisted with shop fittings and repurposed surplus flooring to convert a large concrete… Continue reading Museum

Anderson High School

processed by AtomJPEG 1.5.0n

We installed cubicles supplied by Rearo and fitted vanity units. Additionally, we modified fire doors to meet current fire regulations by installing drop bars and ensuring precise gap measurements. We also installed blinds in classrooms and provided soundproofing enhancements not included in the original design. Furthermore, we fitted wet wall panels in the ensuite bathrooms… Continue reading Anderson High School

A9 Accounting Window Refurb

After storm damage to a dormer window, we replaced it and advised switching from wood to PVC to minimize future maintenance in the high, hard-to-reach area. Services offered: Window replacements, storm damage repairs, and energy-efficient window installations.

Halo Salon

We stripped out and refurbished a unit in Bolts for a new hair salon. Following the client’s vision, we used cost-effective solutions like wallpaper instead of solid boards for the cutting station while integrating all purchased equipment and fittings into the final design. Services offered: Commercial renovations, salon fittings, interior remodeling, and retail space upgrades.… Continue reading Halo Salon

Voe House

We installed a new EPDM Hertalan roof on the west elevation of the building. Additionally, we fitted two kitchen areas and a laundry room, working alongside Westside Electrical and Grant Anderson Painting. We also removed the old east elevation garage and installed a new building to be used as a spa. This included preparing the… Continue reading Voe House

RAF Base

We collaborated with a mainland company to remove and replace cladding at RAF SaxaVord. Given the remote and exposed location work was periodically paused due to radar activity and high winds. Despite these challenges, the project was successfully completed on schedule. Services offered: Cladding replacement, high-wind-resistant installations, and exterior refurbishments.

Park Hall

A client from the mainland approached us to assist in renovating a listed building in need of extensive restoration. Our initial task was to clear years of accumulated debris and prepare the site for scaffolding to stabilise the structure. This proved challenging, as the largest access point was only 700mm wide, requiring our team to… Continue reading Park Hall

Bars

Baroc Bar One of our earliest projects, Baroc Restaurant and Bar, featured a specially designed and crafted bar with a glass top. We worked closely with the client to create a modern-looking bar area that met their standards. KB Bar  We stripped out the old bar and knocked through a wall to create an open-plan… Continue reading Bars